_artwork_Biography, Contact, and Resume Information_artwork_View Work Experience Portfolios_artwork_Educational Portfolios for BSBA, MBA, & PhD_artwork_Teaching and Training Portfolios_artwork_View Current Research and Areas of Interest_artwork_View Presentation Materials and Summaries_artwork_View Publication Information_artwork_

home | professional experience | facility design and construction | specialized facilities

   

Specialized Facility Design & Construction Projects

The specialized facility design and construction projects area has been designed to let you see some of my design work in the physical world involving very unique or highly specialized project types.

 

Conference & Executive Briefing Center

The elevator lobby to Conference & Executive Briefing Center under construction.

Total Square Footage: 15,000 sq.ft.

Total Budget: $3,000,000 (delivered 15% under budget)

Timeline: 9 months (planning through completion)

Role: Consulting Project Manager

Overview: This high technology client needed an briefing and conference facility for its external client presentations and internal staff and project meetings. The CEBC project was designed to meet these needs and included 4 fixed conference rooms with seating capacity for 30 people per room and one large lecture hall room which could be divided into three smaller rooms if needed. All rooms used state-of-the-art technology including either LCD projectors or plasma panels, touch-screen control systems, and top-end audio-visual equipment. Responsible for design of rooms, construction project management, budget control, and selection of interior finishes and furnishings.

   
   

Prototype Manufacturing Facility

Exterior of the prototype manufacturing facility.

Total Square Footage: 10,000 sq.ft.

Total Budget: $2,000,000 (delivered at budget)

Timeline: 1.5 years (planning through FDA validation)

Role: Consulting Project Manager

Overview: A prototype manufacturing facility was built for this client in just over nine months. Space was designed to meet FDA validation requirements as well as client clinical supply delivery targets. Responsible for interior construction project management, furnishings management, and documentation control for validation process.

   
   

Technical Operations Center / Network Operations Control Center

Technical operations center cable runs waiting to be racked.

Total Square Footage: 7,500 sq.ft.

Total Budget: $1,500,000 (delivered at budget)

Timeline: 3 months (planning through completion)

Role: Consulting Project Manager

Overview: This Network Operations Control Center (NOC) was designed for a high technology client and consisted of network closets for their campus as well as a physical monitoring center for all of their global networks. Responsible for furnishings, cable contract management, and interior design and build-out management.

   
   

Data Center

The data center being set up.

Total Square Footage: 25,000 sq.ft.

Total Budget: $3,500,000 (delivered at budget)

Timeline: 6 months (planning through completion)

Role: Consulting Project Manager

Overview: The high technology client funding this data center project was under significant time and third-party constraints to complete this build out. Serving as a consulting project manager, worked with various internal and external constituencies and vendors to ensure an on-time, at-budget delivery. Coordinated the installation of a diesel powered generator (which required a crane to hoist it over the four story building), the installation of dark fiber into the building, the installation of a raised floor, cabling, mounting racks, high-end security systems (palm readers, prox ID badging, and remote alert systems), and a non-water based fire suppression system.

 

   