Specialized
Facility Design & Construction Projects
The specialized facility
design and construction projects area has been designed to let you see
some of my design work in the physical world involving very unique or
highly specialized project types.
| Conference
& Executive Briefing Center |
 |
Total Square Footage:
15,000 sq.ft.
Total
Budget: $3,000,000 (delivered 15% under budget)
Timeline:
9 months (planning through completion)
Role:
Consulting Project Manager
Overview:
This high technology client needed an briefing and conference
facility for its external client presentations and internal staff
and project meetings. The CEBC project was designed to meet these
needs and included 4 fixed conference rooms with seating capacity
for 30 people per room and one large lecture hall room which could
be divided into three smaller rooms if needed. All rooms used state-of-the-art
technology including either LCD projectors or plasma panels, touch-screen
control systems, and top-end audio-visual equipment. Responsible
for design of rooms, construction project management, budget control,
and selection of interior finishes and furnishings. |
| |
|
| |
|
| Prototype
Manufacturing Facility |
 |
Total Square Footage:
10,000 sq.ft.
Total
Budget: $2,000,000 (delivered at budget)
Timeline:
1.5 years (planning through FDA validation)
Role:
Consulting Project Manager
Overview:
A prototype manufacturing facility was built for this client
in just over nine months. Space was designed to meet FDA validation
requirements as well as client clinical supply delivery targets.
Responsible for interior construction project management, furnishings
management, and documentation control for validation process.
|
| |
|
| |
|
| Technical
Operations Center / Network Operations Control Center |
 |
Total Square Footage:
7,500 sq.ft.
Total
Budget: $1,500,000 (delivered at budget)
Timeline:
3 months (planning through completion)
Role:
Consulting Project Manager
Overview:
This Network Operations Control Center (NOC) was designed
for a high technology client and consisted of network closets for
their campus as well as a physical monitoring center for all of
their global networks. Responsible for furnishings, cable contract
management, and interior design and build-out management.
|
| |
|
| |
|
| Data
Center |
 |
Total Square Footage:
25,000 sq.ft.
Total
Budget: $3,500,000 (delivered at budget)
Timeline:
6 months (planning through completion)
Role:
Consulting Project Manager
Overview:
The high technology client funding this data center project
was under significant time and third-party constraints to complete
this build out. Serving as a consulting project manager, worked
with various internal and external constituencies and vendors to
ensure an on-time, at-budget delivery. Coordinated the installation
of a diesel powered generator (which required a crane to hoist it
over the four story building), the installation of dark fiber into
the building, the installation of a raised floor, cabling, mounting
racks, high-end security systems (palm readers, prox ID badging,
and remote alert systems), and a non-water based fire suppression
system.
|
|